How can I advertise my companies power and space for Crypto miners in Bitcoin Pub


#1

I posted once and then the admin threatened to ban me.

What’s the process?

Thanks


#2

Sure. Add it to bazaar. Moved.


#3






INTERESTED? EMAIL ME AND LET ME KNOW WHAT TIME YOU WANT TO DISCUSS YOUR MINING INFRASTRUCTURE DEPLOYMENT REQUIREMENTS AND CLICK THIS LINK BELOW AND WE CAN HAVE A REAL TIME WEBRTC VIDEO CALL

VIDEO WALKTHROUGH HERE !!!

http://www.fibrecentre.com/

Escape the trump tariff on your crypto hardware come to www.fibrecentre.com Fibre Centre Christmas special @ $55 CAD per kW per month.

Miner deployment of at least 1.5MW ( you can start at lower level and scale up)for a minimum three-year contract and three-month deposit, with NO prepayment (billed at the end of a month)

**************55CAD per kW ($40.9385USD per kW or $0.057USD per kWh)

• Half a Megawatt available immediately within Moncton

• 10 Megawatts available in 60 days if a customer places an order on us today.

• 100 Megawatts available = 12-14 months in site Moncton(can be accelerated)

• 150 Megawatt within 6-8 months available within site Ottawa (can be accelerated)

At our Datacenter site Moncton we have 69k volt line, and 345k volts at Datacenter site Ottawa but 345k might be interesting only for 100s of MWs…

email me christian.richards@fibrecentre.com